CTI served as the prime contractor on this hangar for the maintenance of the new F-35 Lightning II aircraft. This Design-Build project encompasses 70,150 square feet of hangar and administrative spaces at Hill Air Force Base, Utah.
CTI constructed the two hangar buildings of a structural steel 180-foot liner open span truss system with a sheet metal exterior building envelope. The two hangars are connected by a 15,000-square foot masonry and steel AMU section, which houses support activities for each hangar and the six F-35 aircrafts that will be maintained and serviced in the hangar facilities.
The office and support area feature locker rooms, restrooms, break areas, and a one-hour fire wall to create a safe and functional work space.